科技公司正在到2026-2027年开发800个VDC电力系统,以便有效地支持AI数据中心不断增长的能源需求。
Tech firms are developing 800 VDC power systems by 2026–2027 to efficiently support AI data centers’ rising energy demands.
2025年10月,包括Vertiv、Eaton和Hitachi能源公司在内的多家技术和基础设施公司正在推进800个VDC电力系统,以满足AI数据中心不断增长的能源需求。
In October 2025, multiple tech and infrastructure firms including Vertiv, Eaton, and Hitachi Energy are advancing 800 VDC power systems to meet the rising energy demands of AI data centers.
这些高压平台旨在支持兆瓦的AI工作量,目的是提高效率、可缩放性和安全性。
These high-voltage platforms, designed to support megawatt-scale AI workloads, aim to improve efficiency, scalability, and safety.
这些系统预计将在2026-2027年之前推出,集成先进的部件,如DC公共汽车路、校正器和能源储存,与即将推出的NVIDIA的Rubin Ultra和Kyber 800 VDC机架设计保持一致。
The systems, expected to roll out by 2026–2027, integrate advanced components like DC busways, rectifiers, and energy storage, aligning with NVIDIA’s upcoming Rubin Ultra and Kyber 800 VDC rack designs.
这一推力反映了工业向开放标准、电网到芯片的电力解决方案的更广泛转变,以应对AI不断增长的电力需求。
The push reflects a broader industry shift toward open-standard, grid-to-chip power solutions to handle AI’s growing electricity needs.