为Windermere核准了一个新的木材防堤,取代1957年的结构,在三年内施工。
A new timber jetty was approved for Windermere, replacing a 1957 structure, with construction due within three years.
2025年10月6日,湖区国家公园管理局批准了在温德米尔Southfield的一座新木材码头的计划,以取代1957年的建筑。
The Lake District National Park Authority approved plans on October 6, 2025, for a new timber jetty at Southfield, Windermere, replacing a structure dating to 1957.
这座 19.8 米长的码头将加宽 300 毫米,并采用经过处理的云杉建造,需要在三年内完成施工。
The 19.8-meter jetty will be widened by 300 millimeters and built with treated spruce, with construction required within three years.
另外,还提交了重建在2024年晚些时候发生的燃气爆炸中受损的白海文房屋的计划,该房屋造成三人受伤,邻居流离失所,旨在恢复该房屋的原貌和邻居的特色.
Separately, plans were submitted to rebuild a Whitehaven home damaged in a late 2024 gas explosion that injured three people and displaced neighbors, aiming to restore the property to match its original appearance and neighborhood character.