Rio Tinto和合作伙伴投资733M澳洲西安吉拉斯矿(West Angelas), 以至2027年维持每年35M吨的产量。
Rio Tinto and partners invest $733M in Australia’s West Angelas mine to sustain 35M tons/year output by 2027.
Rio Tinto及其日本合作伙伴正在西安吉拉斯维持项目投资7.33亿美元, 以维持该矿每年3500万吨的生产能力。
Rio Tinto and its Japanese partners are investing $733 million in the West Angelas Sustaining Project to maintain the mine’s 35 million tonnes per year production capacity.
该项目得到所有相关政府的批准,将开发新的铁矿石矿床,修建22公里的运输道路,并使用自动卡车运输矿石. 建设将创造约600个就业位,预计在2027年投入运营后将有950个全职位.
The project, approved by all relevant governments, will develop new iron ore deposits, build 22 kilometers of haul roads, and use autonomous trucks to transport ore. Construction will create about 600 jobs, with 950 full-time positions expected once operational in 2027.
该倡议包括与土著团体协作保护文化遗产,是Rio Tinto维持Pilbara产出的更广泛战略的一部分,包括为Rhodes Ridge项目进行可行性研究,目标是2030年生产。
The initiative includes collaboration with Indigenous groups to protect cultural heritage and is part of Rio Tinto’s broader strategy to sustain output in the Pilbara, including a pre-feasibility study for the Rhodes Ridge project, targeting 2030 production.