霍顿的LA 3227从2025年10月7日起被绕道,因为道路工程旨在改善安全和基础设施。
LA 3227 in Haughton is detoured starting Oct. 7, 2025, due to roadwork aimed at improving safety and infrastructure.
路易斯安那州交通与发展部 (DOTD) 宣布将在2025年10月7日起,由于路面工程的进行,在哈顿的LA 3227进行重大绕道.
The Louisiana Department of Transportation and Development (DOTD) has announced a major detour for LA 3227 in Haughton, effective October 7, 2025, due to ongoing roadwork.
建筑区周围的绕道改道交通,并设置备用路线,以尽量减少延误。
The detour reroutes traffic around the construction zone, with alternate routes posted to minimize delays.
DOTD敦促驾驶员允许额外旅行时间并仔细跟踪标志。
DOTD urges drivers to allow extra travel time and follow signage carefully.
该项目旨在改善道路安全和基础设施,预计未来几个月的工作将继续进行。
The project aims to improve road safety and infrastructure, with work expected to continue through the coming months.