Auric Mining公司在西澳大利亚以4 400万美元购买完全允许的Burbanks黄金厂,目的是重新开始经营并成为一个一体化黄金生产者。
Auric Mining buys fully permitted Burbanks gold plant in WA for $4.4M, aiming to restart operations and become an integrated gold producer.
Auric Mining公司以440万美元的价格收购了西澳大利亚州完全允许的Burbanks黄金加工厂,从2019年起获得了180 000吨/每纳努姆的闲置设施。
Auric Mining has acquired the fully permitted Burbanks gold processing plant in Western Australia for $4.4 million, gaining a 180,000-tonne-per-annum facility idle since 2019.
矿址包括一个碳浸渍厂、经营许可证、采矿租赁、水权和道路进出。
The site includes a carbon-in-leach plant, operating licenses, mining leases, water rights, and road access.
有了所有许可证,Auric计划迅速发展、评估翻修或重建,以提高能力。
With all permits in place, Auric plans rapid development, evaluating refurbishment or rebuild to increase capacity.
购置支持其目标,即成为一个完全一体化的黄金生产者,在黄金价格上涨和区域能力紧张的情况下,有可能向第三方提供收费加工。
The acquisition supports its goal of becoming a fully integrated gold producer, with potential to offer toll processing to third parties amid rising gold prices and tight regional capacity.