路易斯安那州开始审查价值20亿美元的密西西比河桥,以缓解I-10交通,公众参与,并设定2033年开通目标.
Louisiana begins review for a $2B Mississippi River bridge to ease I-10 traffic, with public input and a 2033 opening target.
经联邦批准后,路易斯安那发展司已开始对巴吞红色以南的一个新的密西西比河桥梁进行环境审查。
The Louisiana DOTD has begun the environmental review for a new Mississippi River bridge south of Baton Rouge, following federal approval.
这项研究将在下一年对伊伯维尔教区的三个地点进行评估,调查结果将于2026年年中完成。
The study will evaluate three sites in Iberville Parish over the next year, with findings due by mid-2026.
一个地方,即Plaquemine Point, 因其古老生长的cypress森林, 面临反对。
One site, Plaquemine Point, faces opposition due to its old-growth cypress forest.
将通过12月的会议和2026年初的正式听证会收集公众意见。
Public input will be gathered through meetings in December and formal hearings in early 2026.
预计到2033年将开通的这座20亿美元的桥梁旨在缓解I-10的拥堵。
The $2 billion bridge, expected to open by 2033, aims to ease I-10 congestion.
DOTD官员将确定是否需要一份全面的环境影响说明。
DOTD officials will determine if a full environmental impact statement is needed.