将英国过时的公共服务网络升级为数字化, 到2040年可以节省3bn英镑, 并在2027年模拟关闭前防止中断。
Upgrading the UK’s outdated public service networks to digital could save £3bn by 2040 and prevent disruptions before the 2027 analog shutdown.
与议会研究的BT报告发现,英国在国民保健体系、能源、水和对数字网络的应急服务等部门的老化类似基础设施升级到2040年可以带来3bn英镑的净经济效益。
A BT report with Assembly Research finds upgrading the UK’s ageing analogue infrastructure in sectors like NHS, energy, water, and emergency services to digital networks could deliver £3bn in net economic benefits by 2040.
主要成果包括:避免了750 000次救护车旅行,免除了1 200万理事会工作人员工时,削减了3.42兆吨碳排放量,节省了1.4亿英镑的能源费用。
Key gains include avoiding 750,000 ambulance trips, freeing 12 million council staff hours, cutting 3.42 megatonnes of carbon emissions, and saving £1.4bn in energy costs.
该研究警告过时系统的风险会增加,公用交换电话网络的恢复力事故将增加45%,定于2027年1月关闭。
The study warns of rising risks from outdated systems, with a 45% increase in resilience incidents on the Public Switched Telephone Network, set for shutdown in January 2027.
BT敦促公共服务部门在2025年底前完成移民,以避免中断。
BT urges public services to complete migration by end of 2025 to avoid disruption.