王子镇提议对基础设施征收2%的税收,避免使用费,并在可管理的债务中包括博物馆维修费。
Prince Township proposes a 2% tax levy for infrastructure, avoids user fees, and includes museum repairs amid manageable debt.
王子镇公布了一项新的基础设施计划,优先考虑基于风险的超过资产年龄的资本替换,提议每年征收2.0%的税收,在十年内筹集325 000美元,尽管官员们建议不要这样做。
Prince Township unveiled a new infrastructure plan prioritizing risk-based capital replacements over asset age, proposing a 2.0% annual tax levy to raise $325,000 over ten years, though officials advised against it.
用户费预计增加5%,将带来35 000美元,但也受到劝阻。
A 5% user fee increase was projected to bring in $35,000 but was also discouraged.
债务仍然可行,当前还款额在25%的收入上限下,现有两笔贷款总额为111万美元,消防设备和桥梁的利息为4.83%。
Debt remains viable, with current repayments under the 25% revenue cap, and two existing loans totaling $1.11 million at 4.83% interest for fire equipment and a bridge.
安理会成员赞扬该报告的清晰性,并包括以前被排除在外的王子镇博物馆的修理。
Council members praised the report’s clarity and included repairs for the Prince Township Museum, previously excluded.