Barton Gold公司为南澳大利亚州黄金项目开展可行性研究,目标是2026年的采掘。
Barton Gold launches feasibility study for South Australia gold project, targeting 2026 mill commissioning.
巴顿黄金控股公司为其在南澳大利亚的 " 挑战者黄金项目 " 发起了一项确定可行性研究,旨在到2026年底委托Central Gawler Mills进行。
Barton Gold Holdings has launched a Definitive Feasibility Study for its Challenger Gold Project in South Australia, aiming to commission the Central Gawler Mill by end-2026.
该项目利用现有基础设施和JORC(2012年)313 000盎司黄金资源,包括后处理历史尾矿,随后引进新的高等级矿石。
The project, leveraging existing infrastructure and a JORC (2012) resource of 313,000 ounces of gold, includes reprocessing historical tailings and later introducing fresh high-grade ore.
这项研究由Altris Pty Ltd在SRK咨询公司和其他方面的支持下牵头,目标是在2026年3月前完成,并力求建立低成本、低风险的业务。
Led by Altris Pty Ltd with support from SRK Consulting and others, the study targets completion by March 2026 and seeks to establish low-cost, low-risk operations.
该公司的目标是在高金价和附近资源的支持下,向生产黄金的矿工过渡,并预计将在今后18个月定期更新。
The company aims to transition into a producing gold miner, supported by strong gold prices and nearby resources, with regular updates expected over the next 18 months.