Asante Gold在加纳新建的32M硫化物厂开始12小时作业,将黄金回收率提高到92%,年产量提高到450K-500K盎司。
Asante Gold starts 12-hour operations at its new $32M sulphide plant in Ghana, boosting gold recovery to 92% and annual output to 450K–500K ounces.
Asante Gold公司在加纳比比亚尼金矿启动了硫化物厂,于2025年9月27日开始12小时运作,全天24小时运作定于9月30日开始。
Asante Gold Corporation has launched its sulphide plant at the Bibiani Gold Mine in Ghana, beginning 12-hour operations on September 27, 2025, with full 24-hour operations set to start September 30.
预算完成的3 200万美元项目旨在通过先进的加工方法,到10月底将黄金回收率从60%提高到92%。
The $32 million project, completed on budget, aims to increase gold recovery from 60% to 92% by late October through advanced processing methods.
该厂设计用于每年处理400万吨矿石,目标是更深的矿石区,预计将将长期产量提高到每年45万至50万盎司。
Designed to handle 4 million tonnes of ore annually, the plant targets deeper ore zones and is expected to boost long-term production to 450,000–500,000 ounces per year.
该公司报告说,2025年没有发生丢失时间或可记录的事故,保持了良好的安全记录。
The company reported zero lost-time or recordable incidents in 2025, maintaining a strong safety record.