印度从苏拉特到比利莫拉的第一道子弹列车线将在2027年开通,
India’s first bullet train line, from Surat to Bilimora, will open in 2027, with construction on track.
印度孟买-阿赫迈达巴德高棉铁路项目(印度第一个子弹列车走廊)的Surat to Bilimora部分将于2027年开通, 据联合铁路部长Ashwini Vaishnaw表示, 他于2025年9月27日视察了苏拉特的进度。
The Surat to Bilimora section of India’s Mumbai-Ahmedabad High-Speed Rail project, the country’s first bullet train corridor, is set to open in 2027, according to Union Railway Minister Ashwini Vaishnaw, who inspected progress in Surat on September 27, 2025.
508公里的走廊有重大的建设里程碑,包括300多公里的管道、近400公里的码头以及广泛的桥梁和隧道工程。
The 508-kilometer corridor has seen major construction milestones, including over 300 kilometers of viaducts, nearly 400 kilometers of piers, and extensive bridge and tunnel work.
位于Antroli村的Surat站正在建造,配有现代化的便利设施、无障碍设施,以及反映城市工业的受钻石启发的设计。
The Surat station, located in Antroli village, is being built with modern amenities, accessibility features, and a diamond-inspired design reflecting the city’s industry.
它将与当地交通相结合,包括可持续的要素,例如雨水收集和节能照明。
It will integrate with local transport and include sustainable elements like rainwater harvesting and energy-efficient lighting.
包括高铁道岔和隔音屏障在内的先进技术被用来支持安全、快速的出行。
Advanced technologies, including high-speed rail turnouts and noise barriers, are being used to support safe, fast travel.