雪线金矿将木星项目的金矿 延展550米 形成新的交汇点
Snowline Gold extends gold deposit at Jupiter project by 550 meters, with strong new intersections.
Snowline Gold报告在育空东部的木星项目中扩大了黄金矿化,钻探将矿床的冲击长度延长了550米,达到约1.9公里。
Snowline Gold reports expanded gold mineralization at its Jupiter project in the eastern Yukon, with drilling extending the deposit’s strike length by 550 meters to about 1.9 kilometers.
在以前未经测试的地区,圆洞J-25-037以每吨金6.82克每吨金相交9.0米,而J-25-039则以每吨金2.6克返回5.5米,这证实了连续性。
Hole J-25-037 intersected 9.0 meters at 6.82 grams per tonne gold in a previously untested area, while J-25-039 returned 5.5 meters at 2.6 grams per tonne gold, confirming continuity.
矿化发生在石英-碳酸盐静脉中,沿沉积岩的推力断层进行,并沿着撞击和深度保持开放。
Mineralization occurs in quartz-carbonate veins along a thrust fault in sedimentary rocks and remains open along strike and depth.
在附近的Rogue项目河谷矿床,持续钻探正在扩大已知矿化范围,超过目前的估计。
At the nearby Rogue project’s Valley deposit, ongoing drilling is extending known mineralization beyond current estimates.
2025年,28 500多米的钻探工作已经完成,大部分分析尚待进行。
Over 28,500 meters of drilling have been completed in 2025, with most assays pending.
该公司继续开展实地工作,以支持未来的发展。
The company continues fieldwork to support future development.