卡利斯佩尔道路的道路划线将于 9 月 22 日开始,以提高安全性,导致延误和速度降低。
Road striping begins Sept. 22 on Kalispell roads to improve safety, causing delays and reduced speeds.
蒙大拿交通部表示, 9月22日在卡利斯佩尔(Kalispell)开始修路, 包括福伊斯湖路(1-5英里)、福伊斯峡谷路(5-7英里)和机场路(7-10英里)。
Road striping work begins September 22 in Kalispell, weather permitting, on Foys Lake Road (miles 1–5), Foys Canyon Road (miles 5–7), and Airport Road (miles 7–10), the Montana Department of Transportation says.
该项目旨在通过更新的车道标识提高道路安全和能见度。
The project aims to improve road safety and visibility through updated lane markings.
机动车手应预期工作区的速度会下降,可能出现延误,建筑设备也会减少。
Motorists should expect reduced speeds, possible delays, and construction equipment in the work zones.
官员敦促司机保持警惕,遵循张贴的标志,并谨慎行事。
Officials urge drivers to stay alert, follow posted signs, and proceed with caution.
建议居民提前规划旅行路线,并允许额外时间。
Residents are advised to plan travel routes in advance and allow extra time.
这项努力是持续维护基础设施以加强公路安全工作的一部分。
The effort is part of ongoing infrastructure maintenance to enhance roadway safety.