巨矿公司采用新的3D模型推进内华达铜-硅-金项目;在Redonda铜-圆柱矿场进行先锋钻探。
Giant Mining advances Nevada copper-silver-gold project with new 3D model; Vanguard drills at Redonda copper-molybdenum site.
巨型采矿公司正在内华达推进其Majuba Hill铜-银-金项目,在RESPEC的帮助下,将2024-2025年的钻头数据和丁ccia体资料纳入3D模型,提高地质精确度,指导未来的钻探和冶金研究。
Giant Mining Corp. is advancing its Majuba Hill copper-silver-gold project in Nevada by integrating 2024–2025 drill data and breccia body information into a 3D model with help from RESPEC, improving geological accuracy and guiding future drilling and metallurgical studies.
更新后的模式包括一些关键目标,如北部和Ball Park Breccias和789个耐力目标,该公司为下一个钻探阶段提供了全部资金。
The updated model includes key targets like the Northern and Ball Park Breccias and the 789 Resistivity Target, with the company fully funded for the next drilling phase.
与此同时,先锋采矿公司在内华达的Redonda铜合金项目中启动了2025年钻探程序,其初步结果为174.1米,占CuEq的0.34%,旨在扩大已知的矿化。
Meanwhile, Vanguard Mining has launched a 2025 drill program at its Redonda copper-molybdenum project in Nevada, following strong initial results of 174.1 meters at 0.34% CuEq, aiming to expand known mineralization.
这两个项目都得益于内华达州有利的采矿环境和现有基础设施。
Both projects benefit from Nevada’s favorable mining environment and existing infrastructure.