TransLink在从伯纳比到西温哥华的一条新的BRT线的两条路线上寻求公众投入。
TransLink seeks public input on two routes for a new BRT line from Burnaby to West Vancouver.
TransLink正在收集公众对两条可能路线的投入,从伯纳比的Metrotown到西温哥华的Park Royal,一条新的21公里公共汽车快速中转(BRT)线路。
TransLink is gathering public input on two potential routes for a new 21-kilometer bus rapid transit (BRT) line from Metrotown in Burnaby to Park Royal in West Vancouver.
BRT将有16个或17个站点,预计将为85 000多户家庭和100 000个工作岗位提供服务,预计每日骑车时间为60 000人,并有60分钟的赶时旅行时间。
The BRT will have 16 or 17 stations and is expected to serve over 85,000 households and 100,000 jobs, with daily ridership projected at 60,000 and a 60-minute rush-hour travel time.
审议中的路线通过黑斯廷斯街和威灵登大道,或边界公路和拉威德公路运营。
Routes under consideration run via Hastings Street and Willingdon Avenue or Boundary Road and Lougheed Highway.
该项目旨在于2027年开始。
The project aims to start in 2027.