加利福尼亚州天堂,推进经过修订的下水道项目,以促进2018年之后的营火后基础设施建设。
Paradise, California, advances revised sewer project to boost infrastructure post-2018 Camp Fire.
加利福尼亚州天堂正在推进一项经过修订的下水道项目,目的是在2018年营火之后改善基础设施。
Paradise, California, is moving forward with a revised sewer project aimed at improving infrastructure after the 2018 Camp Fire.
该项目包括更新的计划和强化的环境考虑,预计将提高该地区的水质和公共卫生。
The project, which includes updated plans and heightened environmental considerations, is expected to enhance water quality and public health in the area.
当地官员希望这个项目也将有助于该镇的长期恢复与发展。
Local officials hope the project will also aid in the town’s long-term recovery and development.