Snowline Gold的育空地区项目预测了20年的采矿活动,产金680万盎司。
Snowline Gold's Yukon project forecasts 20 years of mining, yielding 6.8 million ounces of gold.
Snowline Gold Corporation为加拿大育空地区的谷地黄金矿藏发布了初步经济评估(PEA)。
Snowline Gold Corporation has released a Preliminary Economic Assessment (PEA) for its Valley gold deposit in Canada's Yukon Territory.
报告概述了一项为期20年的露天矿井开采作业,预计可生产680万盎司黄金。
The report outlines a 20-year open pit mining operation projected to produce 6.8 million ounces of gold.
经济重点包括税后净现值33.7亿科多巴元,按2 150/oz美元计算,黄金价值增至6.8亿科多巴元,按3 150/oz美元计算,头五年的年产量预计为544万科多巴元,成本为569.0美元。
Economic highlights include a post-tax net present value of C$3.37 billion at US$2,150/oz gold, rising to C$6.80 billion at US$3,150/oz gold, with an anticipated annual production of 544 koz at US$569/oz in costs for the first five years.