Merimbula Boardwalk西段的维修工程开始,目标是7月重新开放。
Repair work on the Merimbula Boardwalk's western section begins, aiming for a July reopening.
澳大利亚Bega Valley Merimbula Boardwalk西段的修理工作在最近受损后正在进行。
Repair work on the western section of the Merimbula Boardwalk in Bega Valley, Australia, is underway after recent damage.
这项工作由Bega Valley Shire理事会和受训人员领导,获得了保护湖泊生态系统的许可。
Led by the Bega Valley Shire Council and trainees, the work secured a permit to protect the lake ecosystem.
西部地区将在7月底前重新开放,而东部地区的破坏情况则得到评估。
The western section will reopen by July, while the eastern section's damage is assessed.
计划于2026年年中进行的完全更换将包括一个高架的木板行道,以便更好地处理沿海条件。
A full replacement, planned for mid-2026, will include an elevated boardwalk to better handle coastal conditions.