一个机器人开始一个新的任务 从2011年受损的福岛核电厂收集核碎片。
A robot begins a new mission to collect nuclear debris from the Fukushima plant, damaged in 2011.
一个遥控机器人已开始执行第二次任务,从受破坏的福岛核电厂回收融化的核燃料碎片。 2011年,福岛核电厂遭受海啸袭击。
A remote-controlled robot has started its second mission to retrieve melted nuclear fuel debris from the damaged Fukushima nuclear plant, hit by a tsunami in 2011.
“Telesco”机器人携带摄像头和拖把,进入编号。
The "Telesco" robot, carrying cameras and a tong, entered the No.
星期二有2艘反应堆容器,从更深的地区采集样品,目的是开发大规模清理技术。
2 reactor's containment vessel on Tuesday to gather samples from deeper areas, aiming to develop technology for a larger-scale cleanup.
这次访问是在11月第一次尝试之后进行的,11月的尝试面临挑战。
This mission follows the first attempt in November, which faced challenges.
涉及至少880吨碎片的退役进程预计将持续一个多世纪。
The decommissioning process, involving at least 880 tons of debris, is expected to last over a century.