纽约州提奥加县I-86,恢复47M重建,4月1日,将每一条车道的交通减为一条。
I-86 in Tioga County, NY, to resume $47M reconstruction April 1, reducing traffic to one lane each way.
纽约州提奥加县4 700万美元的I-86重建项目于4月1日恢复,东向交通转向西向车道,使每个方向的行程减少到一条车道。
The $47 million I-86 reconstruction project in Tioga County, NY, resumes April 1st with eastbound traffic shifting to the westbound lane, reducing travel to one lane in each direction.
Apalachin的66号东向出入口停靠通道将关闭,施工将持续到11月。
The Exit 66 eastbound off-ramp at Apalachin will be closed, and construction is set to continue through November.
建议机动车驾驶员减速,小心驾驶。
Motorists are advised to slow down and drive carefully.