奥克兰A计划在拉斯维加斯新建一个17.5亿美元的体育场, 将于2028年开放。
The Oakland A's plan to build a new $1.75 billion stadium in Las Vegas, set to open in 2028.
奥克兰A队准备在拉斯维加斯建造一个新的17.5亿美元的体育场,计划在2025年4月至6月期间开始建造。
The Oakland A's are set to build a new $1.75 billion stadium in Las Vegas, with plans to start construction between April and June 2025.
预计到2028年完成,由33 000个座位组成的球场将包括俱乐部空间、套房和冷却系统。
Expected to be completed by 2028, the 33,000-seat ballpark will include club spaces, suites, and cooling systems.
该团队将在建筑期间在萨克拉门托玩耍,并将投资10亿美元,内华达州承诺提供3.8亿美元公共资金。
The team will play in Sacramento during construction and will invest $1 billion, with Nevada promising $380 million in public funds.
体育场的设计是把拉斯维加斯的风气 和传统的棒球经验混合起来。
The stadium is designed to blend a Las Vegas Strip atmosphere with a traditional baseball experience.