新西兰沙漠路将关闭两个月,用于维修桥梁,绕行30-40分钟。
Desert Road in New Zealand to close for two months for bridge repairs, causing a 30-40 minute detour.
新西兰荒漠公路1号公路将从3月开始关闭两个月,用于维修,包括用钢管和水泥板取代曼加托埃托埃努伊桥甲板。
The Desert Road State Highway 1 in New Zealand will close for two months starting in March for maintenance, including replacing the Mangatoetoenui Bridge's deck with steel girders and a concrete slab.
关闭的原因是潜在的地面霜冻和低温。
The closure is due to potential ground frosts and low temperatures.
SH41、SH47、SH4、SH49和Waiouru的SH1将面临30-40分钟的绕道。
Motorists will face a 30-40 minute detour via SH41, SH47, SH4, SH49, and back to SH1 in Waiouru.
新西兰运输局将把奥哈库纳附近的车速限制减少到每小时50公里,并增加路标和警察巡逻。
The NZ Transport Agency will reduce speed limits to 50 km/h near Ohakune and increase signage and police patrols.