由于需要进行更多的模拟,印度空间研究组织将Spadex飞行任务的对接推迟到1月9日。
ISRO delays Spadex mission docking to January 9 due to additional simulations needed.
印度空间研究组织已将其Spadex飞行任务的对接从2025年1月7日推迟到1月9日,因为需要根据已查明的中止情况进行更多的地面模拟。
ISRO has postponed the docking of its Spadex mission from January 7 to January 9, 2025, due to the need for additional ground simulations following an identified abort scenario.
该飞行任务于12月30日发射,涉及两颗小型卫星,演示会合、对接和拆卸技术。
The mission, launched on December 30, involves two small satellites demonstrating rendezvous, docking, and undocking technologies.
这一技术对今后的任务至关重要,包括派遣一名印度宇航员到月球和建立空间站。
This technology is crucial for future missions, including sending an Indian astronaut to the Moon and establishing a space station.