Metro温哥华建造了一个450M美元抗震水隧道,到2028年保证供水。 Metro Vancouver builds a $450M earthquake-resistant water tunnel to secure water supply by 2028.
Metro温哥华正在Fraser河下建造一个4.5亿美元的抗震水隧道,连接萨里和新威斯敏斯特。 Metro Vancouver is building a $450 million earthquake-resistant water tunnel under the Fraser River, connecting Surrey and New Westminster. 预计到2028年完成,Annacis供水隧道的设计将经受9级地震,并确保Fraser河以南社区的供水。 Expected to be completed by 2028, the Annacis Water Supply Tunnel is designed to withstand a magnitude 9 earthquake and ensure water availability for communities south of the Fraser River. 2.3公里隧道是若干主要项目的一部分,旨在保障该地区的供水,目前已完成60%的建筑工程。 The 2.3-kilometer tunnel is part of several major projects aimed at securing the region's water supply, with construction currently 60% complete.