俄亥俄州DOT开始美国35号交叉路口的更换 由全高速公路交接,从10月30号开始
Ohio DOT begins U.S. 35 intersection replacement with a full highway interchange, starting Oct 30.
从10月30日起,俄亥俄州交通部(ODOT)正在用全面公路交接取代美国与山谷和特雷贝因公路的35个交叉点。
The Ohio Department of Transportation (ODOT) is replacing the U.S. 35 intersection with Valley and Trebein Roads with a full highway interchange, starting October 30.
西向美国35号公路的交通将转向交替坡道,东行道预计将在11月中旬行驶。
Westbound U.S. 35 traffic will shift to interchange ramps, with eastbound lanes expected to move in mid-November.
这一建筑旨在加强安全和交通流量。
This construction aims to enhance safety and traffic flow.
另外,在Xenia的Fairground路上正在进行道路扩建工作,
Additionally, road-widening work on Fairground Road in Xenia is ongoing, maintaining one-lane traffic during the day.