Atico Mining Corp.报告了2 2024Q2净损失,但由于航运延误,在Q3中预计采矿产量增加,收入增加。 Atico Mining Corp. reported Q2 2024 net loss, but increased mine production and strong revenue expected in Q3 due to shipping delays.
Atico Mining Corp.公布了2024年第二季度净亏损$0.4M,采矿收入为$2.6M。 Atico Mining Corp. reported a Q2 2024 net loss of $0.4M, with $2.6M in mining income. El Roble矿生产了3.7M磅铜,2 850ooz金,9 972oz银,比Q2-2023增加32%和23%。 The El Roble mine produced 3.7M lbs of copper, 2,850 oz of gold, and 9,972 oz of silver, up 32% and 23% from Q2-2023. 尽管净亏损,但由于航运延误,预计第三季度的收入将很大. Despite the net loss, strong revenues are expected in Q3 due to shipping delays. 后半重点包括生产、成本效益、拉普拉塔项目开发以及El Roble的近矿钻探方案。 Second half focus includes production, cost efficiency, La Plata project development, and near-mine drill program at El Roble.