在Bathurst以西的Mitchell公路上进行为期三周的基本排水维护工作,首先关闭了道路,并限制40公里/小时的车速。 3-week essential drainage maintenance work on Mitchell Highway west of Bathurst begins with lane closures and a 40 km/h speed limit.
Bathurst以西Mitchell公路一段路段的3周基本排水维护工作从路段关闭开始,周日7点至5点有40公里/小时速度限制。 3-week essential drainage maintenance work on a section of Mitchell Highway west of Bathurst begins with lane closures and a 40 km/h speed limit during weekdays 7am-5pm. 这项工作由新南威尔士州运输公司开展,此前有报道称,高速公路发生坠毁热点,两年内发生10次坠毁。 The work, carried out by Transport for NSW, follows reports of a crash hot spot on the highway, with 10 crashes in 2 years. 新南威尔士州政府正在升级Bathurst和Orange之间的Mitchell公路路段,根据调查结果制定两个地点未来工作计划。 The NSW Government is upgrading sections of the Mitchell Highway between Bathurst and Orange, with plans for future work at two sites based on survey results.