伦敦北部16英里铁路段 (贝克卢和地铁线) 改造价值975万美元, 取代过期设备以减少延误. 16-mile north London railway stretch (Bakerloo and Overground lines) upgraded for $97.5m, replacing life-expired equipment to reduce delays.
铁路网更新了伦敦北部16英里长的铁路干线,包括贝克卢和地面线,安装了新的电缆,更新了电力系统,以取代报废设备。 Network Rail upgraded a 16-mile north London railway stretch, including the Bakerloo and Overground lines, installing new cables and updating power systems to replace life-expired equipment. 在8月3日至8日之间完成的9 750万美元项目旨在减少延误,确保今后旅途更加顺畅。 The $97.5m project, completed between Aug 3-8, aims to reduce delays and ensure smoother journeys in the future. TfL和网络铁路公司感谢乘客在升级期间的耐心。 TfL and Network Rail thanked passengers for their patience during the upgrades.