Red Pine Exploration 报告了安大略省 Wawa Gold 项目的 5 个钻孔的新金矿化结果;Jubilee Shear 系统显示深处有开放的金矿化,等待 8 月份资源估算更新。 Red Pine Exploration reports new gold assays from 5 drill holes in Wawa Gold Project, Ontario; Jubilee Shear system shows open gold mineralization at depth, awaiting Aug. resource estimate update.
Red Pine Exploration Inc. 报告了其在安大略省 Wawa 金矿项目正在进行的 2022-2024 年资源扩展钻探计划中从 5 个额外钻孔中获得的新黄金分析结果。 Red Pine Exploration Inc. has reported new gold assay results from 5 additional drill holes in its ongoing 2022-2024 resource expansion drilling program at the Wawa Gold Project in Ontario. 该公司已完成约67,000米的金刚石钻探,其中60,300米用于更新矿产资源估算。 The company has completed approximately 67,000 meters of diamond drilling, with 60,300 meters used to update the mineral resource estimate. 最新结果表明,Jubilee Shear 系统内有大量金矿化,且深处的金矿化仍然开放。 The latest results indicate significant gold mineralization within the Jubilee Shear system, with gold mineralization remaining open at depth. 独立的43-101资源估算预计将于8月完成。 The independent 43-101 resource estimate is expected to be completed in August.