澳大利亚南部高地的居民正在呼吁恢复耗资 3.9 亿美元的奥斯利山立交人行天桥。 Residents in Southern Highlands, Australia, campaign for reinstatement of $390M Mount Ousley Interchange pedestrian bridge.
澳大利亚南部高地的居民正在发起一项活动,要求恢复耗资 3.9 亿美元的奥斯利山立交人行天桥。 Residents in Southern Highlands, Australia, are launching a campaign to have a $390M Mount Ousley Interchange pedestrian bridge reinstated. 这座桥最初是在公众咨询中承诺建造的,但在授予合同后被从项目中取消。 The bridge was initially promised in public consultation, but was removed from the project after awarding the contract. 社区团体将于 5 月 20 日举行一次公开会议,敦促联邦政府和新南威尔士州政府重新考虑并恢复这座桥,以确保行人和骑自行车的人的安全。 Community groups will host a public meeting on May 20th, urging the Federal and NSW Governments to reconsider and reinstate the bridge for pedestrian and cyclist safety.