拉各斯州计划从 2024 年 2 月 2 日至 5 月 10 日关闭海洋大桥 98 天,以进行维护、替代路线、交通管理和减少干扰。 Lagos State schedules 98-day Marine Bridge closure from Feb 2 to May 10, 2024, for maintenance, with alternative routes, traffic management, and disruption reduction.
拉各斯州政府计划从 2024 年 2 月 2 日至 5 月 10 日,对海洋大桥的 Ijora 7 桥端进行为期 98 天的关闭,以进行彻底的维护工作。 The Lagos State Government has scheduled a 98-day closure of the Ijora 7-up end of the Marine Bridge, starting from February 2nd to May 10th, 2024, for thorough maintenance works. 维修期间,驾车人士必须遵循政府设定的替代路线。 Motorists are required to follow the alternative routes set by the government during the repair period. 将部署交通管理人员来管理交通并减少干扰,确保受影响路线上的交通畅通。 Traffic management personnel will be deployed to manage the traffic and reduce disruptions, ensuring smooth flow along the affected routes.