BRO 在 J&K 的 Akhnoor-Poonch 国道 144A 上修建了一条 700 米长的 Naushera 隧道,标志着战略性金弧路项目取得进展。 BRO constructs a 700-meter Naushera tunnel on the Akhnoor-Poonch National Highway 144A in J&K, marking progress in the strategic Golden Arc Road project.
边境道路组织(BRO)在查谟和克什米尔的 Akhnoor-Poonch 国道 144A 上成功修建了一条 700 米长的 Naushera 隧道,标志着战略性金弧路项目的重要里程碑。 The Border Roads Organisation (BRO) has successfully constructed a 700-meter Naushera tunnel on the Akhnoor-Poonch National Highway 144A in Jammu and Kashmir, marking a significant milestone in the strategic Golden Arc Road project. Naushera 隧道对于连接 Akhnoor 和 Poonch 至关重要,是旨在加强区域连通性和国家高速公路沿线交通顺畅的大型项目的一部分。 The Naushera tunnel is crucial to connecting Akhnoor and Poonch and is part of a larger project aimed at enhancing regional connectivity and smoother transportation along the National Highway. 边境公路局局长拉古·斯里尼瓦桑中将表示,整个项目正在按计划进行,预计将于 2026 年完成,边境公路局将致力于加强该地区的国防基础设施和改善社会经济进步。 According to the Director General of Border Roads, Lieutenant General Raghu Srinivasan, the entire project is on track and is expected to be completed by 2026, with the BRO dedicated to strengthening defense infrastructure and improving socio-economic progress in the area.